Case Study - Floating Wind Turbine Quayside Motions
- Charles Scott
- Jul 15
- 1 min read
Updated: Sep 2
Offshore Energy - Early Engineering

Overview:
Scott Marine Consultants conducted an investigation into the sensitivity of floating wind turbine integration using Orcaflex. This study considered lifting operations from an onshore crane onto a floating foundation considering realistic assumptions, including:
Wind and Waves (including very low swell seen in ports)
Impact of mooring type
Allowable motions for safe lifting
Value Added:
Realistic understanding of critical operations, including:
Estimation of Weather Downtime
Development of realistic construction schedules
Early Identification of mitigation measures
Planning of safe operations at earliest opportunity.
Risk Mitigation